10 free, exam-style Certified Energy Auditor (CEA) practice questions with answers and explanations. No signup required. Work through them below, then take the full free CEA practice test to study every exam domain.

These 10 free CEA questions are organized by exam domain, so you can see how each part of the Certified Energy Auditor blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Developing an Energy Audit Strategy & Plan (9%-13%)

Question 1

A federal agency is entering into an Energy Savings Performance Contract (ESPC) with an ESCO for a 200,000 sf office complex. Per ANSI/ASHRAE/ACCA Standard 211-2018, which minimum audit level is required before the contract can be executed?

  1. Level 1 - Walk-Through Assessment
  2. Level 2 - Energy Survey and Analysis
  3. Level 3 - Investment-Grade Audit
  4. Level 0 - Preliminary Benchmarking with ENERGY STAR Portfolio Manager
Show answer & explanation

Correct answer: C - Level 3 - Investment-Grade Audit

Domain 2: Energy Use Analysis (7%-11%)

Question 2

A 50,000 sf commercial building consumed 425,000 kWh of electricity and 3,200 Mcf of natural gas last year. Using 3,412 Btu/kWh and 1,038,000 Btu/Mcf, what is the building's site Energy Use Intensity (EUI) in kBtu/sf/yr?

  1. 29.0 kBtu/sf/yr
  2. 95.4 kBtu/sf/yr
  3. 93.0 kBtu/sf/yr
  4. 125.4 kBtu/sf/yr
Show answer & explanation

Correct answer: B - 95.4 kBtu/sf/yr

Domain 3: Data Collection & Analysis (8%-12%)

Question 3

During a Level 2 energy audit of a commercial office building, a CEA completes a lighting retrofit and needs to verify savings. The auditor measures the wattage of the new fixtures after installation but uses published operating-hour schedules from DOE rather than metering actual hours. According to the International Performance Measurement and Verification Protocol (IPMVP), which M&V option is being applied?

  1. Option A - Retrofit Isolation: Key Parameter Measurement
  2. Option B - Retrofit Isolation: All Parameter Measurement
  3. Option C - Whole Facility
  4. Option D - Calibrated Simulation
Show answer & explanation

Correct answer: A - Option A - Retrofit Isolation: Key Parameter Measurement

Domain 4: Economic Analysis (7%-11%)

Question 4

A $120,000 HVAC upgrade is projected to save $28,000 per year in energy costs over a 7-year useful life. Using a discount rate of 6% and a present value annuity factor of 5.582 for 7 years at 6%, what is the Net Present Value (NPV) of this project?

  1. $36,296
  2. $76,000
  3. $156,296
  4. $−44,296
Show answer & explanation

Correct answer: A - $36,296

Domain 5: Lighting Systems (6%-8%)

Question 5

An energy auditor recommends replacing 200 existing 250-watt metal halide high-bay fixtures with 100-watt LED high-bay fixtures in a warehouse operating 4,160 hours per year. What are the annual energy savings from the lighting retrofit alone, excluding any HVAC interactive effects?

  1. 62,400 kWh/yr
  2. 83,200 kWh/yr
  3. 124,800 kWh/yr
  4. 208,000 kWh/yr
Show answer & explanation

Correct answer: C - 124,800 kWh/yr

Domain 6: Heating, Ventilation & Air Conditioning Systems (12%-18%)

Question 6

A water-cooled centrifugal chiller operates at 0.65 kW/ton at full load. What is the chiller's Coefficient of Performance (COP)?

  1. 4.21
  2. 5.41
  3. 6.15
  4. 18.46
Show answer & explanation

Correct answer: B - 5.41

Question 7

An air handling unit supplies 15,000 CFM of air at 55°F to a space maintained at 74°F. Using the sensible heat formula Q = 1.08 × CFM × ΔT, what is the sensible cooling capacity being delivered to the space?

  1. 162,000 Btu/hr
  2. 307,800 Btu/hr
  3. 891,000 Btu/hr
  4. 25.4 tons
Show answer & explanation

Correct answer: B - 307,800 Btu/hr

Domain 8: Motors & Drives & Compressed Air Systems (8%-12%)

Question 8

A three-phase, 480V electric motor draws 52 amps and operates at a power factor of 0.87. What is the motor's electrical demand in kW?

  1. 21.7 kW
  2. 37.6 kW
  3. 43.2 kW
  4. 75.1 kW
Show answer & explanation

Correct answer: B - 37.6 kW

Question 9

A variable-air-volume (VAV) supply fan currently operates at full speed, consuming 30 kW. A variable-frequency drive (VFD) is installed and reduces the average fan speed to 75% of design. Using the fan affinity laws, what is the approximate power consumption at the reduced speed?

  1. 22.5 kW
  2. 16.9 kW
  3. 12.7 kW
  4. 7.5 kW
Show answer & explanation

Correct answer: C - 12.7 kW

Domain 10: BAS, PAS and EMCS (6%-8%)

Question 10

An energy auditor reviews trend data from a building automation system (BAS) and discovers that a multi-zone VAV air handling unit maintains a constant duct static pressure setpoint of 2.5 in. w.c. at all times, regardless of zone demand. Which ASHRAE 90.1-2019 requirement is this system failing to comply with?

  1. Section 6.4.3.8 - Demand-Controlled Ventilation
  2. Section 6.5.3.2.3 - Static Pressure Reset for VAV systems
  3. Section 6.5.1 - Economizer requirements
  4. Section 6.5.3.4 - Supply Air Temperature Reset
Show answer & explanation

Correct answer: B - Section 6.5.3.2.3 - Static Pressure Reset for VAV systems

The rest of the CEA blueprint

The CEA exam also covers these domains. Drill them in the full free practice test:

Ready for the real thing?

Practice hundreds more CEA questions with instant scoring, weak-area drills, and full exam simulations.

Start the free practice test See pricing